In following operations are to be performed on a job, which one would be performed first
A.Drilling
B.Boring
C.Counter sinking
D.Tapping
E.Sport facing
A.Drilling
B.Boring
C.Counter sinking
D.Tapping
E.Sport facing
A.0 to 100 cps
B.30 to 15000 cps
C.15000 to 25000 cps
D.25000 to 10000 cps
A.Smoothen surfaces
B.Fill the void by welding
C.Remove the extra material from castings
D.To remove internal stresses from castings
E.To produce uniformly cooled castings.
A.Trammel
B.Hermaphrodite caliper
C.Divider
D.Angle iron
E.Sine bar
A.At the surface
B.Through the metals to be welded
C.At the point of contact of the metal to be welded
D.At the point where electrode contacts the metal
E.None of the above
A.A switch which operates for a fixed time only
B.A switch which gets energised with time
C.A 24 hour timing device used to open and close electric circuits according to time of day on a continually repeating schedule
D.A switch with records timings of operation of a circuit
E.None of the above
A.Shear plane and job surface
B.Shear plane and verticalplane
C.Shear plane and horizontal plane
D.Shear plane and tool surface
E.Shear plane and tool axis
A.Mild steel
B.Cast steel
C.Pig iron
D.Close grain cast iron
E.Alloy steel
A.Alumina, clay and silica
B.Alumina and clay
C.Aluminium and silica
D.Silica and binder
E.Silica and clay
A.is complexity of components
B.is costly maintenance
C.Suffers from the transmission lags and slow response
D.None of the above
E.All of the above