A.rX1/rx2 = Px2/Px1
B.rX1/rx2 > Px2/Px1
C.rX1/rx2 < Px2/Px1
D.rX1/rx2 = Px1/Px2
Related Mcqs:
- Enterprise budgeting deals with input-output relationship of:
- Given that: Y = 30 X10.25 X20.60 Where Y = output, X1 = Input factor 1, and X2 = input factor 2, the nature of return to scale will be:
- Total installed cost of a centrifugal pump coupled with drive and capable of developing 1000 ft head at 500 gpm is to be calculated using Rs. 55000 as the cost of a pump of 500 ft head at 1000 gpm. The cost estimation method involves the term capacity which will be taken as (gpm)x (head)y where
- The total cost incurred in the operation of a business undertaking other than the cost of manufacturing and production is known as________??
- If the cost of an equipment of the desired capacity is not available it may be estimated from the cost of another equipment using the formula
- A man sells two houses for Rs. 24000 each. He maks 20% of the cost price on the first, but on the second he has a loss of 30% of the cost price. How much did he gain or loss by this transaction?
- The initial cost of an equipment is Rs. 20 lakhs and depreciated cost after ten years is Rs. 15 lakhs. The useful life of the equipment is
- A.P.P. Will be equal to (Y = output, X = input):
- Find the cost of goods sold if goods are sold for 2,000 at 25% profit on cost??
- The other name of overhed cost is: