A water cooler is installed with one ton vapour compression cycle. In 24 hours it will provide

Refrigeration and Air conditioning Mcqs

A.0.1 ton of cold water
B.Half ton of cold water
C.One tonne of cold water
D.More than one tonne of cold water

Leave a Reply

Your email address will not be published. Required fields are marked *