If during operation of a boiler one of the riveted joints is found leaking

Machine Design Mcqs

A.The boiler is stopped immediately
B.All the riveted joints are reopened and gain riveted
C.Depending upon the zone of boiler in which the joint leaks, decision is taken
D.The joint is repaired if in low pressure zones otherwise boiler sent for repairs
E.None of the above

Leave a Reply

Your email address will not be published. Required fields are marked *