The minimum demand on a power station is 10 MW. If the annular load factor is 40%, total evergy generated per year will be

Energy Conversion Mcqs

A.35.04 x 108 kWh
B.35.04 x 107 kWh
C.35.04 x 106 kWh
D.35.04 x 105 kWh