Preheating of material to be welded is necessary in case of
A.Carbon steel
B.Stainless steel
C.High speed steel
D.Cast iron
E.Non-ferrous materials
A.Carbon steel
B.Stainless steel
C.High speed steel
D.Cast iron
E.Non-ferrous materials
A.Recruitment
B.Selection
C.Human resource planning
D.Placement
E.Human resource auditing
A.its mass exceeds critical mass
B.its mass is just equal to critical mass
C.its mass is less than critical mass
D.all of these answers.
A.Cohesion
B.Adhesion
C.Adhesion and cohesion
D.Molecular structure
E.Gravity
A.Assembly halls
B.Restaurants
C.Bed-rooms
D.Class rooms
A.Zero percent
B.1 – 2 percent
C.2 – 5 percent
D.Upto 15 percent
E.Upto 25 percent
A.Circle
B.Square
C.Rectangle
D.Parallelogram
E.Rhombus
A.Is done in steps
B.Is done by continuously increasing the work load
C.Is done by applying load in a short period during specified intervals
D.Is done by applying the load slowly enough so that all parts of the specimen are in equilibrium at any instant
E.None of the above
A.3.14 cm/s
B.31.4 cm/s
C.314 cm/s
D.3140 cm/s
E.31400 cm/s
A.To improve electrical capacity
B.To improve efficiency
C.To reduce power factor
D.To improve power factor
E.None of the above