Overtime payment is a
A.perquisite
B.bonus
C.demand
D.incentive
A.perquisite
B.bonus
C.demand
D.incentive
A.Austenite
B.Pearlite
C.Cementite
D.Eutectoid
E.Ferrite
A.Low power loss
B.High velocity ratio
C.Ease of manufacture
D.Minimum cost
E.All of the above
A.1600 N/mm2
B.1200 N/mm2
C.800 N/mm2
D.400 N/mm2
A.Surface to be left unmachined
B.Surface to be machined
C.Core prints
D.Seat for loose core prints
E.Fillets
A.Surface to be left unmachined
B.Surfaces to be machined
C.Core prints
D.Seats for loose core prints
E.Fillets
A.A and B
B.A and C
C.B and C
D.C and D
E.A and D
A.0.1 tonne
B.0.2 tonne
C.2 tonnes
D.20 tonnes
A.4 to 6
B.6 to 12
C.12 to 20
D.20 to 25
E.25 to 30
A.Brass pipe
B.Glass pipe
C.Asbestos cement pipe
D.Corrugated iron pipe
E.Vitrified sewer pipe