Drag line excavators are used for digging
A.drainage ditches
B.canals
C.gravel pits
D.Any of the above
A.drainage ditches
B.canals
C.gravel pits
D.Any of the above
A.2
B.4
C.8
D.12
A.The mechanical advantage will be high
B.The load will be sustained in absence of effort
C.The mechanical advantage will be low
D.The load will be easily lifted
E.While unloading, little effort will be required
A.1
B.1.25
C.1.5
D.2
E.2.5
A.kg – m
B.kg – m3
C.kg – m4
D.(kg – m)2
E.m4
A.a radiation pyrometer
B.an optical pyrometer
C.a resistance thermometer
D.None of the above
A.Dynamic friction
B.Rolling friction
C.Kinetic friction
D.Limiting friction
E.Sliding friction
A.designed for continuous duty
B.not designed for continuous duty
A.Thermopile
B.Ionization chamber
C.Moving coil generator
D.Photovoltaic cell
E.All of the above
A.The flow of material in the plant
B.The ways and means for proper utilization of manpower
C.The ways and means for proper utilization of machines
D.Inspection of final products
E.Normal route of workers through the plant