A generating station is to supply four regions of loads with peak demands of 10 MW, 15 MW, 20 MW and 30 MW. If the diversity factor is 1.5 the maximum demand on the station is
A.70 MW
B.60 MW
C.50 MW
D.45 MW
E.30 MW
A.Steel
B.Aluminium
C.Brass
D.Bronze
E.Cast iron
A.Capacitive
B.Inductive
C.Magneto-electric
D.Photoelectric
E.Any of the above
A.The temperature of the sink increases
B.The temperature of the sink remains the same
C.The temperature of the source decreases
D.The temperature of both the sink and the source decreases
E.Changes depend on the operating conditions
A.producing thin castings
B.better surface finish
C.tolerances of the order of 0.002 mm per mm
D.all of the above
A.Specific humidity increases
B.Specific humidity decreases
C.Relative humidity increases
D.Relative humidity decreases
E.Relative humidity does not change
A.Employee rights
B.Management rights
C.Government rights
D.(A) and (C)
E.(A) and (B)
A.Fuel
B.Coolant
C.Reflector
D.Moderator
E.Shield
A.Float with 3/4 of volume above the liquid surface
B.Float with upside down
C.Float for sometime and then sink
D.Sink
E.Float with 1/4 of volume above the liquid level
A.2?3
B.3?4
C.4?5
D.5?4
E.3?2