M.T.M. helps in
A.Establishing time standards
B.Estimating cost
C.Improving existing methods
D.Developing methods before the starting of production
E.All of the above
A.Establishing time standards
B.Estimating cost
C.Improving existing methods
D.Developing methods before the starting of production
E.All of the above
A.0.02 ppm
B.0.2 ppm
C.2 ppm
D.20 ppm
A.Venturimeter
B.Rotameter
C.Pitot tube
D.Hot wire anemometer
E.None of the above
A.Elements of quality control
B.Elimination of quality inspection
C.End of quality inspection stage
D.Economic order quantity
E.None of the above
A.Jawaha Sagar
B.Rana Pratap Sagar
C.Gandhi Sagar
D.All of the above three
E.None of the above
A.come to rest
B.move towards left
C.move towards right
D.may move in any direction
A.Arc cutting
B.Oxyacetylene flame
C.Punching
D.Drilling
E.Any of the above
A.Arsenic salts
B.Borax
C.Wet ash
D.Alum
A.Reciprocal of resistance
B.Reciprocal of inductance
C.Reciprocal of capacitance
D.Reciprocal of impedance
E.None of the above
A.Vee threads
B.BSW threads
C.Buttress threads
D.Square threads
E.None of the above