A.zero slack
B.minimum slack
C.maximum slack
D.infinite slack
Related Mcqs:
- At critical point the enthalpy of vaporisation is
- At critical point the latent enthalpy of vaporisation is
- In an open channel the discharge corresponding to critical depth is
- At minimum reflux ratio the operating cost of a distillation column is
- For a reversible adiabatic process the change in entropy is
- The lag in daily temperature refers to the time lag between the ____________.
- Critical path method is good for
- For transmission lines the standing wave ratio is the ratio of
- Sensitiveness of a governor is
- In a distillation operation total reflux requires