A.40%
B.50%
C.60%
D.75%
E.80%
Related Mcqs:
- In a system if base load is same as maximum demand, the load factor will be
- The average load factor of thermal power plants in India is
- Which of the following plant is suitable for peak load?
- All of the following plants are suitable for peak load EXCEPT:
- If the average temperature of the sun increased, the wavelength of peak solar emission would ______________.
- Capacity of a hydro-electric plant in service in excess of the peak load is known as
- Portion of the installed reserve kept in operable condition but not placed in service to supply the peak load is known as
- Capacitor kVA required to bring the power factor of a 500 kW load 70% to 85% would be
- A generating station is to supply four regions of loads with peak demands of 10 MW, 15 MW, 20 MW and 30 MW. If the diversity factor is 1.5 the maximum demand on the station is
- The power factor of a three phase induction motor at no load will be