A.Stability of rating scale
B.Worker acceptance
C.Valid
D.Quickly constructed
E.Reliable
Related Mcqs:
- Which one of the following is not a job evaluation criteria?
- The objective of time study is to determine the time required to complete a job by
- A/An __________ assessment is one which measures what it is intended to measure.?
- The men had constructed the bridge.
- An assessment is __________ if it consistently achieves the same results with the same (or similar) students.?
- Turbidity of water is usually measured in terms of
- What is the use of Document Map in Ms Word??
- Scale sensitivity is defined as
- I said to the worker, “How do you like your job ?”
- The intensity of earthquakes is measured on: